Digging Holes

There is a lot of prep work needed when you build a poly-tunnel including a lot of it is digging holes. I’ve dug four holes, each 2ft back from the door and will be a corner of a raised bed. It will act as a support to prevent the door frame from bending inward. Postcrete is an instant mix that sets in 10 or 15 minutes letting me get on with more work.

Hail stopped play and went into my workshop and installed the stairs to the lower section of my shed; its mahogany and very very heavy. Rather than have an odd sized top step with the treads perfectly horizontal, I lifted the stairs so the top step is level and the tread slopes slightly downward. It’s a very slight slope.