Most of the trenches were dug using the mini-digger, I did need to dig about four or five yards of trench by hand. The tree roots held up work but nothing a bit of sweat could not fix.
The next job was to cut the door posts and fix the end water pipes to the door posts using metal strips wrapped around the pipe and screwed into place. The rest of the water pipe hoops were put in place and fixed to a batten running from door post to door post. The distance between each hoop, was measured at the base and same distance marked on the timber.
It’s now looking like it’s a polytunnel.