Pictures speak a 1000 words. With the use of the JCB from the neighbouring farmers, Ian and James Adam, 2 hours work with their machine would have taken many demoralising and back-breaking days of work by hand.
The photos at the top show the area at the top of the field, where we will put down membrane and type 1 gravel (funding required) and it will become a disabled and unloading parking area.
The lower picture shows the field clear of weeds and can see SOIL!


